Development Facilitators, Inc. (DFI) provided services to Anne Arundel County by supplying construction management and inspection for the removal of an 18" culvert and the replacement with a 59 L.F. 72" Class IV reinforced concrete pipe with a TYPE A Headwalls. The installation included all excavation and reconstruction of the roadway and enhancements, roadway paving, removal and replacement of an existing fire hydrant and protection of existing underground and overhead utilities.
A major component of this project was the creation of an extensive step pool stormwater conveyance system consisting of four alignments of cascades and wiffle veirs. A majority of the work involved excavation and construction in the tidal pond of Bear Creek without the loss of any sediment from the site. The project concluded with the planting of over 500 trees and shrubs and 6000 plugs.