The Downs Park Amphitheater project required full demolition of the existing, outdated amphitheater with a nouvelle contemporary design. Attention to detail for hurricane resistant engineering and fashionable finishes created a pleasant outing for the enjoyment of the arts.
DFI provided Engineering services for this project. DFI coordinated the Storm Water Management (SWM) pond design with foundations, which expanded wetlands as a result in order to remediate contaminated soils.