The underground storage tank, located in Anne Arundel County, Maryland, included installation of concrete slab, backfill, drafting pipe, paving and other additional work.
DFI provided Construction Management and Inspection (CM&I) services for the underground water storage tank. The work the installation of a 40,000 gallon underground water storage tank, excavation, installation of a concrete slab, backfill, installation of a drafting pipe, paving of an asphalt access road, and other miscellaneous work. Throughout design and construction, DFI was essential to the project’s success. With exemplary synergy fostered among the Owner, Contractor, and DFI, Anne Arundel County has been endowed with a valuable new asset.